You're reading: Wind Solar Energy intends to build wind farm in Zhytomyr region

Wind Solar Energy LLC (Kyiv) intends to build a 60 MW wind power plant in Zhytomyr region, according to the website of the unified register of environmental impact assessment.

The project includes building 18 wind turbines with a capacity of up to 5.6 MW each. The height of the towers will be 166 meters, the diameter of the rotor is up to 150 meters.

In addition, the plans include the construction of 12 km of technological roads, 12 km of cable networks, as well as power lines of up to 6 km. The operation life of the wind farm is 20 years.

As reported, Wind Solar Energy intends to build three phases of the Lisova wind plant with a total capacity of up to 190 MW in the area of the Pokaliv village (Korosten district, Zhytomyr region).

According to data posted on the company’s website, Wind Solar Energy through its subsidiary Solar Kvant has been operating solar plants of 5 MW on 10 hectares in Dnipropetrovsk region since 2013.

According to the unified register of legal entities, the ultimate beneficial owner of Wind Solar Energy is Elvira Tesliuk, before that the Cypriot company WSE CYPRUS LTD was in the ownership structure.